Fttp install process 1 stage. Now again you see a Planned state for FTTP, but it normally goes in a matter of days when orders can be processed. Fttp install process 1 stage

 
 Now again you see a Planned state for FTTP, but it normally goes in a matter of days when orders can be processedFttp install process 1 stage The duct to the property is also internal (which I understand is atypical) and so OR would require access if R&R was needed, which could be problematic with current restrictions

We'll drill a small hole in your wall to push the cable through, before covering it tidily with the box. FTTP installation . I have Openreach coming on Thursday to install FTTP. Our current anchor point is high up on a gable of the house. Hello, I'm hoping someone can provide some insight into a 1 stage install for full fibre. Straightforward installation. I currently have FTTC with Sky but I'm looking for the reliability/extra speed as I work from home full time. Then just follow our step-by-step guide to install your broadband yourself. Step 5. Thus either FTTP (using gross return or time to pay back investment) or FTTN (using. 75,000 per week. About a month ago Openreach removed the BBU and the case just housed the ONT. 14/02/2021 - DIY installed 22mm barrier pipe as conduit from outside wall to inside wall ready for fibre with a couple of draw ropes. FTTP and Cable). We have made several attempts to initiate the process of establishing an nbn network connection to your building, however we have been unsuccessful in our engagement with the building’s authorised representative. From the cabinet to your home or business,. e. As different areas started their rollouts at different times there will still be some areas using legacy. The second phase involves the ongoing rollout of faster Fibre-to-the-Premises broadband infrastructure – using light signals via optical fibre, instead of slower electrical signals via copper. g. Price adjustment. They are both faster than conventional ADSL, but FTTP uses fiber all the way, while FTTC has to rely on a slower copper cable. Re: Rod and rope process. Availability Checker. On mine, it says "1 Stage", and in the notes "Single Dwelling Unit Residential UG Proven Clear. I've since moved into a house which has an FTTP utility. ; Full Fibre 2 offers average download speeds of 67Mbps. We recall writing about the new premium service trial some time ago and, if memory serves, it brings a number of benefits, on top of the standard connection. The only issue is that they've mounted massive Connectorised Block Terminals (CBT) 2metres up on the front of every building (up to 8 connection terminals in each one) and they look awful and this is before any connections to individual flats are made. 0. However, if you have FTTC then it's unlikely you'll get FTTP any time soon. The first should apply to FTTP and say something about your line feed (OH or UG). Re: FTTP Install Process. FTTP install process: 1 Stage. In this video Paul will discussing what you can expect from the point you order your Full Fibre service with Zen through to going live. Your provider will also be able to confirm that your equipment is working, but in some cases this process may take a couple of days. Initial attempts to engage key businesses in Australian telecommunications in planning and development; and. If you want the cabling going through the downstairs ‘loo’ as you call it I’d personally drill the hole and fit the conduit yourself for two reasons. The process of actually getting your free FTTP upgrade is a little bit more complicated than you might think, however, and there are a few catches to be aware of - this guide covers those and more. Ask the BT Community. The issue is this - depending on who you speak with, it's either a one visit / one technician job (the one guy comes out and installs both boxes), or a two visit / two technician job (one to install the utility box, one to install the connection box). When I ordered FTTP my line was showing Stage 1, since it has been installed it has been changed to Stage 2 and is now displayed KCI2 Assure. The operator added that eligibility of an order for the. The exchange (same one for all the village) is not on OR's latest Full Fibre Build Programme list to get FTTP by end 2026. If folk want (and if I've solved my smartphone battery death issue by then) I'll see if I can provide information during the process. A cool, dry, ventilated area. My phone doesn’t have a dial tone. Done Building dependency tree Reading state information. On 20 September 2013 I blogged about the first stage of my Fibre To The Premises (FTTP) broadband installation. Right now, the NBN Co is rolling out a major upgrade to connect your home to the internet with a faster, more reliable fibre optic connection known as Fibre to the Premises (FTTP). 2 million recently built homes passed. FTTP is not available. I have just placed a new order for FTTP install, not a migration of existing FTTC. Aside: I believe it's "1 Stage", rather than "Stage 1". Multi-stage developments. your upcoming installation, and help to answer any questions you may have. 5 billion in upgrades to 8 million premises to get speeds of up to 1 gigabit per second. Currently the copper connection runs down to a bedroom window and in through the window frame. You can also download the guide. We are now on BT Fibre 1. Messages. 4 x Gigabit LAN. Is this normal? The notes below show as: single dwelling unit residential ug premises served by 2. are you in a fibre priority area or in an estate newer than about 2000. Credit to the company. 1 stage install – between 9 and 18 working days, depending on availability An engineer will install an ONT at your premises to connect to the nearby fibre cable. But FTTP’s light signals enable faster data transmission. So you may end up having to go down the full fibre route at some point in the. For all ADSL and WBC Fibre to the Cabinet (VDSL or G. As we head towards winter, Openreach is talking of product launches and communication providers selling the services as a retail product in. Vodafone Full Fibre Plans. However last month I noticed overhead fibre cables bought down telegraph poles and tied up out side each property. Deciding to refuse the connection will be an internal matter that the owners corporation will need to weigh up between themselves in an. " Ref: KCI2 Assure :: Fibre Broadband :: think broadband. A decision maker over the age of 18 is there throughout the whole appointment slot. GFast: 330 Mbps. Openreach have now undertaken 1st and 2nd Stage installation of 1. Reply 5 REPLIES 5With router + 2 APs (set up so backhaul makes two hops) it'd drop to 20mbit. The process of actually getting your free FTTP upgrade is a little bit more complicated than you might think, however, and there are a few catches to be aware of - this guide covers those and more. Hi All, Last time I had a new line installed, because it was a 2nd phone line to the house I managed to convince the Openreach engineer to install the phone line to the upstairs spare room. FTTP only allows an aggregate bandwidth of 1. The Broadband light and the Service light should be solid green, and the . Our records show the following FTTP network service information for these premises:-Single Dwelling Unit Residential OH Feed with no anticipated issues. BT then installed FTTC end of 2017 for the rest of my area, even though FTTP hardware is in place. WPA3. In March 2020, Openreach and BT launched new FTTP service speeds (up to 1000 Mbps), with lower pricing, but these higher speeds are still only available from BT. I’ve gone from the older g. 3: Seeker. FTTP and Cable). Nice friendly chaps, could tell they took care to do things right. Hello all, long time no post. . Find out everything you need including information on equipment and installation. g. g. FTTC provides a fibre optic cable from your nearby exchange to your local cabinet. Engineer showed me the ONT Huawei 1-port modem (your image). In my case I had witnessed the FTTP install team laying the fibre in my street, and on speaking to them they assured me they were making it available to the entire housing development. Click here to. ”. FTTP install process: 1 Stage . In March 2020, Openreach and BT launched new FTTP service speeds (up to 1000 Mbps), with lower pricing, but these higher speeds are still only available from BT. 8 out of the 21 show "1 Stage" under "FTTP Install Process" - the rest showing "KCI2 Assure" most with "potential Line of sight problems". Contact a Service Provider with a FTTP compatible broadband product. I was hoping some one could help point me in the right direction to escalate as BT Sales seem to be both getting the run around. If you can get Quickstart, you can choose one of two delivery options. In either case, you'll have an ONT and then the Sky Hub router. 1st Openreach visit to install a small box on the outside of your property and bring the fibre from your nearest point to you. FTP enables the transfer of. On 11 Apr 2014 I was told: Our suppliers have advised a site survey is the next course of action with your order. Re: Contacting FTTP Connections Team. There's definitely a central comms/service room for each floor. (It was Kelly. Re: Delayed Installation FTTP. It is important to note that these may not be the speeds you are actually getting, so it is vital. . The build cost is valid for 4 weeks, so please let us know how you would like to. Mine is due between 8am. 17th October, 2023 (30 Comments) Ofcom has today published the latest edition of their forecast for Planned Network Deployments, which predicts that the full fibre (FTTP) broadband ISP lines are on course to cover 91% (27 million premises) of all UK properties by May 2026 – rising to 94% for “gigabit-capable” networks (i. Stay competitive by offering customers this high-speed upgrade option. If your home is eligible for a FTTP connection, the upgrade is FREE. Everything you need to know about our Fibre to the home installation process i. We’ll arrange a. This survey normally won't need you to be present, but if it's not. I live in a detached house, currently the phone line comes up in the middle of the house under the stairs, I have had low level cupboards with a bench top installed there and the NTE5 is in behind one of the cupboards, the cupboard has no back on. 95 setup cost depending on the package. Developer self-installation guide. I think the visit is within a week of ordering. Hey r/nbn, I'm moving to a new place pretty soon and was using the check address feature on the NBNco website to determine internet availibility. If everything is correct and all checks are passed, you may now click the Install button in the top right corner of the Overview page. FTTP had just become available in my area so I have placed an order which is scheduled for 14th August and has been listed as a 1 stage install. Premise where a 2 Stage WBC-FTTP install is needed when going live. Reasons why you might need a survey to get Fibre to the Home >My Installation – Pre Works. g. edmanning555. Fibers 1 to 8 are the feeder fibers, and each will connect from the central office directly to a stage 1 splitter somewhere in the service area. if corrosion is due to homeowner problems then you may be charge for engineer visit but if external then should be free. At present TalkTalk ’s platform. We can install your router and your customers’ equipment in a single, hassle-free appointment. 01-01-2022 3:26 PM. 1 technology, while more than 1 million of their premises are also being served by “full fibre” FTTP using the older Radio Frequency over Glass (RFoG) approach to ensure compatibility between both sides of. Here’s how FTTH—also called fiber to the premises (FTTP)—works: The fiber is installed from your ISP’s closest central office to a box, called an optical network. (regular) Fri 02-Apr-21 07:49:39. Some folks also refer to it colloquially as ‘Fibre to the Home’ or ‘FTTH’. If I compare the the addresses on the wholesale checker the only difference is the "FTTP Install Process" field. Openreach’s infrastructure connects homes and businesses across the UK. GRAY . Areas subject to high dust or potential damage such as in a workshop. Bob+L 23 Aug 2023 10:09 AM hi, A relatives 66mb superfast FTTC broadband with landline phone contract reaches the end of its 18 months term next month. It will be adjacent to the location that your current copper telephone cable enters your premises. Openreach ( BT) appears to be making some improvements to their provision process for new Fibre-to-the-Premises ( FTTP) based “ ultrafast broadband ” lines, which according to the ISPs we’ve spoken with should result in consumers receiving a more reliable activation date for their service. Hello. The handbook for building the fibre infrastructure also explains how to install our equipment yourself. As you can see, in some cases – such as the minimum speeds for FTTP – you might actually be better off using FTTC if it’s available at a high speed in your area. Stage 1 - External work to bring a fibre cable to your property. 5bn on. For comparison, most standard FTTC broadband is usually only available in speeds up to around 75Mbps. In process of building a house. I had an installation for FTTP booked and when the engineer from Kelly showed up, he insisted that the fibre had to enter the premises at the point nearest the overhead pole, and that the router would need to be on the ground floor in the room directly at the front of the house. Update: 01/08/2020 – TalkTalk and Sky have now launched their full FTTH offerings (Covid slowed things down as it should have been in Q2). I really wouldn’t worry or read too much into it, given what you’ve said about the ducts being freshly roped up to the CSP etc etc. Re: FTTP Installation (Landlord problem) FTTP will become the primary and only available fixed line method of getting a broadband connection. 0 Gbps full fibre capability to my house. The NBN installer advised that the NTD box. Single or two stage install is indicated when the property was surveyed , before the FTTP build was started, it’s never been the case that every install was two stage , then single stage added to the process , it’s always been subject to the. 2nd Openreach visit to bring the fibre from the small box on your property to inside and to install the internal equipment. 1 x Gigabit WAN. . The average connection times are between 9 and 18 working days (subject to engineer availability). Unlike traditional broadband (also known as FTTC), Full Fibre is powered by a fibre cable direct to your home, giving you a faster and more reliable broadband connection. 1 stage install: this is when the fibre cable termination is quite close to your premises. On some occasions, our engineers may not be able to complete the work the same day. For fortunate FTTC homes that are in FTTP upgrade areas, they’ll need to order at least an NBN 250 plan to kickstart the free upgrade. Ours is using the old Huawei 4 data, 2 phone port ONT. October 16, 2013. How we'll install your FTTP. Once a phone line is in place, the technician will make sure your home has internet access and. Following this, your order will get sent to planners who will. Actual speeds experienced by end users and quoted by CPs will be lower due to a number of factors within and external to BT's network. We would like to show you a description here but the site won’t allow us. The fibres are run underground down the street, but then up to the top of telephone poles. 21 out of 54 properties on our close show as FTTP available. The technology used will be XGS-PON. The External Installation is always completed by Call Flow. WBC FTTP is available at my house as a 1 Stage Install Process – “Single Dwelling Unit Residential OH Feed with no anticipated issues. (It was Kelly)FTTP is a superior, more future-proof technology than Fibre-to-the-Cabinet (FTTC), which has now seen widespread deployment. Our records show the following FTTP network service information for these premises:-Single Dwelling Unit Residential UG premises served by 2. NBNco installer refused to complete my FTTP install. WBC FTTP Up to 1000 Up to 220 -- Available 1 Stage. Can anyone shed anylight on the FTTP enablement process? We missed out on FTTC as we are exchange only and too far away. Though internet speeds are increased significantly with FTTP, people are still reporting they are facing a slow or unstable internet. Re: Halo 3 Vs Halo 1 (internet speed reduction) the speed range for your line is 80/60mb and you are nowhere near that. If you already have an ONT, it’s very quick to get connected. A question regarding FTTP installation, which should finally happen tomorrow!. Re: Confused about phone line with Full Fibre FTTP package. Re: FTTP cable entry into house. Fibre Broadband Guide Learn what 'fibre'broadband' is and how it can benefit you (including FTTC and FTTP) Resolving a problem with your broadband provider (step-by-step guide to resolving a problem with your broadband provider). The most common FTTH splitters deployed in a PON system is a uniform power splitter with a 1:N or 2:N splitting ratio (N=2~64), where N is the number of output ports. At our previous residence we had HFC installed by a really decent NBNco tech, which took him a couple of hours and involved running cables through the wall cavity and crawlspace from the awkward position the NBN box was placed outside. A FTTP installation gone wrong. This means data passes quicker, but you need to be close to your street cabinet or an installed ‘node. When I had mine done, they told me the whole process would take around 2 months before I will be hooked up and running. Otherwise, if you meet these requirements for the first 12 months, then. FTTP from pole via loft space. FTTP Installation Process. Brian. When I ordered FTTP my line was showing Stage 1, since it has been installed it has been changed to Stage 2 and is now displayed KCI2 Assure. [ re: deleted] [ link to this post] OpenReach are usually fine with running the fibre along the external wall of the property to the entry point of your choosing (within reason and at ground level). We’ll remotely activate a port on the ONT. Yeah so the point of a CSP is to transition external grade cabling, to internal grade cabling mostly from a fire and smoke safety perspective. With faster upload speeds and higher levels of service and support compared to residential plans – these plans are designed to meet the. Areas of high activity/traffic in your house where it may be bumped or knocked. Consequently, nbn does not currently plan to install a network connection to your building, unless we receive a request from the Owners’. I have no idea whether they can do it and have the wall outlets, cat6 cables, etc, or they simply come, install their equipment, test it and leave. This will start the actual installation process. But I guess it depends on how busy Openreach are in your area as to the timeframe. Find out if you can connect to fast broadband. I wanted the router to be at the back. Broadband Fixed Line. Go to solution. Usually your engineer will use the hole from your existing phone line. That’s a best-case scenario, but you should otherwise expect it to be completed in no longer than an hour or so. When I do a check with BT Wholesale, WBC FTTP is available to my property with 1 stage install. The Government is providing up to £210m worth of voucher funding as immediate help for people experiencing slow broadband speeds in rural areas. I know this isn't a big deal. Fixed: Hi, received email now stating FTTP available, when using the checker, it says WBC FTTP available on left hand side, at the right hand side. 99 for a new landline, but it’s free if you already have one. If I go into the living room, client steering puts me onto the mesh network, I can only get 200-300mbps. There was a small rectangular openreach access point set just outside my driveway recently. Option 1: The simple install The simplest installation will be the provision of the Openreach equipment (i. Stage 2: The internal installation The Internal Installation extends the fibre optic cable to a suitable location for your optical terminating equipment (modem) and router. Is that a typical lead time for FTTP installation? I checked on the BT wholesale BB availability checker and noticed that prior to placing an order the FTTP install process was 1. This gives you control over when you install the optical network termination (ONT) and battery backup unit (BBU) equipment in the property, along with the other services at first and second fix. The MRL concept was developed by the United States Department of Defence (DoD) to assess the maturity of a manufacturing process throughout its conception, development, deployment and support progression phases. Lastly, for the most complex of orders, we may need two stages to install fibre. With speeds of up to 1Gbps, it's ready for anything whether that's binge watching your favourite box set in UHD. @Stuvennn with FTTP the ONT is the modem and you can connect any router you want to it but the router must support Sky's authentication which uses DHCPv4 Option61 or DHCPv6 PD some do some dont. I am currently an FTTC customer so the order has been placed as a regrade. 1 stage install: this is when the fibre cable termination is quite close to your premises. If you experience any issues while setting up the service, please visit the Troubleshooting section. Planning is the phase where the service provider designs the network layout,. 1 stage installs tend to be when the customer is feed over head or existing ducting is identified. £165 - £275 a day. Standard fibre broadband uses fibre cables from the exchange to your street cabinet, then from there uses older copper cables to connect to your home. It might not just be the span length but other issues, even a new intermediary pole which would take time. Just get FTTP installed, you don't need to get BT voice or anything just get the FTTP internet connection installed. Go to solution. The package installs a service that is started during the boot process of your UniFi device and that will set up the applications necessary to route IPTV traffic. Re: Ongoing nightmare - Failed FTTP Install. FTTP install process: 1 Stage . Firstly, the one-off FoD build charge exemption per PON (Passive Optical Network) is being cut from £700. The checker says it is a one stage install ergo no outside box. The order is stuck with BT retail and going nowhere. The exchange is not in a current fibre priority programme. We call these areas ‘exchanges’, and most of our full fibre build plan is organised around them. 1st. In the UK, Vodafone currently offers a choice of six different speeds on their full fibre broadband service: Full Fibre 1 offers average download speeds of 38Mbps. Just a note for anyone interested - OpenReach appear to have added a new field to the DSL Checker. The Openreach engineer was able to run the fibre cable from the outside box direct to the ONT to my upstairs office via a bedroom. Read the Cebr's research report and our Blueprint to learn more about our commitment to delivering great connectivity to communities across the UK. From the the link you kindly provided. A hole will be drilled through your external wall next to the small box that was installed during Stage 1, and an internal fibre optic cable (provided by Trooli) is routed. Compatible with Smart Wi-Fi Booster 3. Fibre-optic core is made of strands of glass or plastic that carry through pulses of flashing light, without any losses due to electromagnetic interference. I checked on the BT wholesale BB availability checker and noticed that prior to placing an order the FTTP install process was 1 stage. In most cases you'll be able to talk to the. Edited by Micro (Thu 01-Apr-21 19:27:04) DrPepper. e. Your engineer will install a small junction box on an outside wall and connect the fibre cable to it. I recently had Community Fibre FTTP broadband installed, and found that I couldn’t see much information online about the equipment and process – so here’s what I now know. However, I would prefer the cable to be underground. 4 Installation Process. I would like the ONT to be placed on the wall at the back of a cupboard, I have attached a picture to show this. Lastly, for the most complex of orders, we may need two stages to install fibre. At the time of writing, the plan was for 2 million homes to be able to access an FTTP connection by the end of 2023, joining the 3. Re: FTTP Installation in block of flats. about 50 years old. Now to see how long the process takes, from churning FTTN->Exetel, and then the ordering/NBNCo install process :) *Update ~less than an hour from order Well, FTNN already transferred across, but PPPoE settings werent sent prior to the service being sent over, so called support and got those pretty quick. Stage 1 install date should be quick to get, KCI 2 it will need someone to possible have a peak to figure out what needs doing e. 8 would make sense as I believe the one CBT at the top of the. Fibre to the X (FTTx) refers to all types of fibre infrastructure including FTTH, FTTP, FTTC, and FTTN, while FTTH refers to fibre-to-the-home and is synonymous with FTTP. Our wayleave application will include the route plan, wayleave agreement and an explanation of why we need permission. If FTTP is only in the planned stage you may find. The fibre cable was run to the premise and left in an external Customer Splice Point box (CSP). This means it can deliver ultrafast broadband speeds up to 900Mb, and makes it the UK’s most reliable broadband technology too. So as explained, FTTP is available, OR are aware of the potential difficulties, and will look at this in two stages ( should you order ), the first. Compatible with Smart Wi-Fi Booster 3. They are also on strike on Monday. Re: Openreach FTTP, Internal CSP possible. Forgive me if this has been asked many times before. FTTH Network Splitting Ratio Design. WBC FTTP Up to 1000 Up to 220 -- Available 1 Stage. From anyone’s experience will Openreach tack the cable around to the back of the house where my current router is situated as I have ample. First we'll do some work outside your property, then complete the installation inside your home. Phone lines/System and Voice-over-IP. Standard installation of NBN equipment should take around two hours but it may take as long as eight hours, depending on the complexity. While the more common fibre-to-the-cabinet (FTTC) connection still uses older copper cables to transmit data from a telephone cabinet to your home, FTTP broadband uses fibre optic lines directly from your provider’s exchange to. Activation of service. pre-visit to check that ducting on your property is clear and unblocked. This installation limits the number of physical connections to the router and means theUltrafast Fibre-to-the-Premises (FTTP) is the ultimate broadband technology in terms of reliability and performance (e. If you rent your property that you have the landlord's permission for us to drill a small hole on the inside and outside of the building. The public briefing note for this change is about. Fiber-to-the-home (FTTH) is a type of fiber-optic connection that connects one residence or work to another. The attached picture shows my line and has "1 stage" - I've also seen "2 stage". At the moment Openreach will assign an installation as 1 stage (where all the external and internal work is done on the same visit or 2 stage (where external work is completed before the internal visit). You’ll be able to choose from a range of plans including Full Fibre 100 (100Mbps), Ultrafast (145Mbps), Ultrafast Plus (500Mbps) and Gigafast broadband (900Mbps). First agree with your engineer where the FTTP connection will enter your premises. The FTTP installation process involves four main steps: planning, construction, testing, and activation. 3 (part number 4002881)* Fiber to the Premises (FTTP) Single Wire Return Device (SWRD) with Power-over- Data (PoD) Installation Instructions, part number 4007948 Application. This guide explains the process. Where the copper comes into the house at the front I don’t have any power. The National Broadband Network had its origins in 2006 when the Federal Labor Opposition led by Kim Beazley committed the Australian Labor Party, if elected to government to a 'super-fast' national broadband network. cable should be plugged into the Phone. Fibers 9 to 12 are the distribution fibers that connect a stage 1 splitter to a stage 2 splitter. Re: FTTP Installation Process I've tried the checker based on the post code and I get this: Sorry this postcode has not been recognised by this checker, this could be because this is a new address with a new postcode that has not yet included in our database or the postcode does not align to an exchange area. Some of the recommended locations for installation include: Within 1. At present, Openreach’s full fibre rollout. 17-05-2022 02:55 PM. Sky has only been carrying out second stage installs for a short time so it's difficult to say. Featured Products Downstream Line Rate(Mbps) Upstream Line Rate (Mbps) Downstream Range (Mbps) Availability Date FTTP Install Process FTTP on Demand 330 50 -- Available --ADSL Products Downstream Line Rate (Mbps) Upstream Line Rate (Mbps) Downstream Range(Mbps) ADSL Availability Date WBC SOADSL Availability Date Left. What does it say for 'FTTP install Process' ? Here is example. Email BTOR FTTP Now Available. TSP45. Its being installed on Wednesday, I will dig a channel to the 'elephants foot' where the existing copper. The rest of the village has no OR FTTP availability. Fiber from the registrant's home or office to the central. 1 stage install: this is when the fibre cable termination is quite close to your premises. It must be ventilated and have sufficient lighting. Any sparky you hire won't have any of this. I ordered on Sunday 17th May, the first engineer was out on. FTTP stands for ‘fibre-to-the-premises’, a shared bandwidth service, also known as ‘full-fibre’, or ‘fibre optic’. The nokia ONT's certainly are teeny so mentioned there certainly was no. Happy to show me the whole process, blowing the fibre and splicing etc. 1 stage install – between 9 and 18 working days, depending on availability Contact a Service Provider with a FTTP compatible broadband product. If the number is busy it automatically redirects to CS 150 so you just have to hang up and try later. Some of the recommended locations for installation include: Within 1. Re: FTTP install process - equipment location « Reply #5 on: May 06, 2020, 11:33:33 AM » Thanks all - 30 metres would be plenty, I just think it's going to be a bit of an eyesore if they have to run it under the sill of the door to get to the left hand side, but there is no use bringing it in to any of the rooms on the right hand side of the. « on: December 14, 2021, 06:23:46 PM ». MrSaffron. Jan 13, 2022. BT_SMS is also used to send out Openreach video on Vimeo to guide customers through the FTTP installation process as Openreach use Vimeo now. The exchange is not in a current fibre priority programme. I know fibre has been laid in the street as checking the Availability Checker again against the other addresses all the remaining properties have WBC FTTP listed as available with the FTTP install process listed as either KCI2 Assure / 1 Stage. Fibre-to-the-premises, also known as FTTP or full fibre broadband, is a type of fibre optic broadband connection. If it says 'KCI2 Assure', there will be a survey of your duct. All types of nbn® network connections that utilise a physical line running to the premises are considered Fixed Line connections. I was told that now they can only provision these packages over FTTP so need OR to come and do a brand new install. I noticed the other day FTTP is available in my area so have ordered this, had no notifications from BT that FTTP was available, but I know CityFibre have. Perhaps you would care to post your output from the BT availability checker ( redact any phone/address details ) as the 'FTTP install process' and any narrative at the bottom may give a better idea of likely install situation Openreach have completed 1st Stage installation, which included entering my house and connecting the copper wire cable (part of full fibre cable) to my existing FTTC NTE5c Mk2 master socket. I had hoped the process of getting FTTP would be painless but it seems all the work has to be done by the developer! Pheasant (knowledge is power) Sat 05-Nov-22 14:59:11: Re: Question regarding BT Openreach FTTP installation [link to this post] You’ve only got a relatively small part of the overall picture with the JBs guide. Usually your engineer will use the hole from your existing phone line. One thing common in both is a fibre optic cable running directly from the Internet Service Provider (ISP) to a home or business location. FTTP Install - Practical details of install [link to this post] I am considering getting BT FTTP. 3 Stage 2: Work to complete the fibre installation inside the property. NOTE:. no need for an extra copper line if you take FTTP). [ re: deleted] [ link to this post] Stage 1 install date should be quick to get, KCI 2 it will need someone to possible have a peak to figure out what needs doing e. 5 Additional. fast is a product that delivers faster download speeds over the existing telephone line, using a different frequency. The whole process can take. . I noticed some work going on, a while back at her roa. NBN's Fibre Connect Program (or "free FTTP upgrade") suggests you need to stay on 250/25Mbps plan minimum for at least 12 months. The installation has the physical appearance of being FTTdp on the telegraph pole next to my house. The first part of the installation process involves Openreach putting the actual fibre cables in place in each street. A wayleave is permission from the landlord, or land owner, to access their building or private land to install or repair network and equipment. Just curiosity as the chances of FTTP appearing in my village in my lifetime are slim to none. 5 inch plastic duct 56. For me, it comes in under the ground floor front window and inside runs under the window sill to where I wanted the box on the other side of the bay. the 08005874787 is the correct number for FTTP Team. due to yesterday's strike by BT and openreach the line will be very busy today. This shows up on the Checker as 2 Stage. Previously, it was just a one-stage process. FTTP installation questions. In late 2020, the Coalition announced $4. Easily apply: Driving to customers houses and premises. The full. FTTP is available and a new ONT may be ordered. Once the installation completes, you should. The bad news, according to several ISPs that we’ve discussed it with, is that Openreach have said they will stop providing ONT BBU units as default in FTTP-only areas and then. 9 kB of archives. In which case, the exemption per premises passed by PON (Passive Optical Network) will not be applied to the fixed build charge. As a result, the lead time is longer and the product has different pricing and terms. 4 x Gigabit LAN. Copper cables are an older technology and less reliable than fibre cables. If your parents order SuperFast Fibre from BT it will be 55Mb FTTP. This shows up on the Checker as 2 Stage. They can often run the fibre round the external of your property. I recently switched from an ISP I’d been with for many years to Vodafone Full Fibre and wanted to share my experience of receiving fantastic service throughout the whole process. 1.